Callahan Tunnel reopens after truck will get caught, backing up site visitors

Native Information

The over-height automobile was caught for about 25 minutes as motorists waited for lanes to reopen.

An over-height truck obtained caught in Boston’s Callahan Tunnel Friday afternoon, inflicting a short lived closure that backed up site visitors, in keeping with the Massachusetts Division of Transportation (MassDOT). 

MassDOT tweeted in regards to the incident simply earlier than 1 p.m. on Friday, asking drivers to hunt an alternate route. The truck was caught on the entrance of the tunnel for a complete of 25 minutes.

Route 1A runs by way of the tunnel, connecting downtown to East Boston and Logan Worldwide Airport. Video shared on-line exhibits an officer guiding the over-height truck because it backs up on the busy roadway. 

The left lane was the primary to open again as much as motorists, in keeping with MassDOT, adopted by the suitable lane after the truck had been cleared. No accidents had been reported.

The mishap coincided with the closure of the Sumner Tunnel, one other busy Boston thruway, which stays shut down resulting from a development undertaking.


Posted

in

by